Report Deliverable Preview

Sample Pre-Delivery Inspection Report

This interactive preview showcases the structured format, photographic defect catalog, and builder rectification checklist delivered within 24–48 hours of your home inspection.

Official Snagging & Inspection Report

PDI Audit — Pride Platinum, Wakad, Pune

Report Ref: DT-20261025-WAKAD•Unit: Flat 804, Tower B (3 BHK)•Inspector: Senior Civil Engineer (PDI Lead)
28
Total Snags Identified
2
Critical (Safety Hazard)
9
Major (Rework Needed)
17
Minor (Cosmetic Finishing)

Swipeable Defect Photo Reel

Touch or swipe across defect evidence captured during the on-site walkthrough. Tap any image to expand.

Reverse Polarity on 16A Air Conditioner Socket
CRITICALMaster Bedroom
Inspect Defect
Reverse Polarity on 16A Air Conditioner Socket
Tap to zoom photo
8 Hollow Vitrified Floor Tiles (Void Under Surface)
MAJORLiving & Dining Room
Inspect Defect
8 Hollow Vitrified Floor Tiles (Void Under Surface)
Tap to zoom photo
Reverse Floor Slope Causing Water Puddle Around Commode
MAJORCommon Bathroom
Inspect Defect
Reverse Floor Slope Causing Water Puddle Around Commode
Tap to zoom photo
Active Seepage at Stainless Steel Sink Bottle Trap Flexi-Pipe
MAJORKitchen & Dry Balcony
Inspect Defect
Active Seepage at Stainless Steel Sink Bottle Trap Flexi-Pipe
Tap to zoom photo
Missing Silicone Weather Sealant on Outer Aluminium Frame
MINORBalcony
Inspect Defect
Missing Silicone Weather Sealant on Outer Aluminium Frame
Tap to zoom photo

Documented Snag List with Photographic Evidence

SNAG-01Master BedroomElectrical Safety
CRITICAL

Reverse Polarity on 16A Air Conditioner Socket

Socket test instrument detected Live and Neutral terminals wired in reverse. Potential electrical fire and component burnout hazard for split AC unit.

Recommended Action: Builder licensed electrician must open modular faceplate and reconnect Phase to Right terminal and Neutral to Left terminal.
Builder Status: Mandatory before appliance installation
SNAG-02Living & Dining RoomCivil & Flooring
MAJOR

8 Hollow Vitrified Floor Tiles (Void Under Surface)

Acoustic tap hammer examination revealed extensive hollow sounds across an 8-tile cluster near balcony sliding door. Caused by insufficient mortar adhesive spread.

Recommended Action: Carefully dismantle hollow tiles, scrape dry substrate, re-apply polymer-modified tile adhesive bed, and re-grout perimeter with epoxy.
Builder Status: Rectify before furniture placement
SNAG-03Common BathroomPlumbing & Drainage
MAJOR

Reverse Floor Slope Causing Water Puddle Around Commode

Water flow test demonstrated stagnant puddle accumulating behind wall-hung WC rather than draining into nahani floor trap. 6mm slope deviation recorded.

Recommended Action: Re-lay floor tiles in wet area with positive minimum 1:100 slope directed toward floor drain.
Builder Status: Rectify to prevent mold and dampness
SNAG-04Kitchen & Dry BalconyPlumbing Leakage
MAJOR

Active Seepage at Stainless Steel Sink Bottle Trap Flexi-Pipe

Continuous water discharge under kitchen counter during sink drainage test. Unsealed rubber washer at PVC trap joint.

Recommended Action: Replace degraded rubber o-ring washer and reseal joint with Teflon plumbing tape.
Builder Status: Immediate fix required
SNAG-05BalconyFinishing & Safety
MINOR

Missing Silicone Weather Sealant on Outer Aluminium Frame

Visible 4mm gap between powder-coated aluminium window frame and external plaster lintel. High risk of rainwater ingress during Pune monsoons.

Recommended Action: Inject structural neutral-cure silicone weather sealant along exterior perimeter joint.
Builder Status: Standard cosmetic snag

Deliverable Note: Reports are sent via secure download link in PDF format.

No confidential customer data is exposed publicly.

Book Your Flat Inspection